To the central content area

The Inspection and Certification Third Party on Due Recycled Waste (Waste Motor Vehicles-south Region)

Absrtact
The execution results of the Project conducted by FTIS during the project executed period, April 01, 2005 to March 31, 2006, can be summarized as following: 1. Inspection and certification include certified recycled-disposal quantity ˙execute 100% engine auditing on site of waste motor vehicle, body clearance auditing of waste motor vehicle, and factory resident auditing. ˙certified engine quantity:88,865 cars and 199,752 motorcycles certified disposal quantity:78,650 cars and 176,503 motorcycles certified body clearance quantity:48,585,380 kg ˙exporting verification quantity:9,327 cars and 24,067 motorcycles ˙factory resident auditing on comminuting classifying disposal enterprises of waste motor vehicles(Green Environment Engineering Incorporation, Sun Chi Yuan E.P.T. CO., Ltd., Gi Ho Chen Environmental Technology Co., Ltd. And Clean Up Environment Technology Corp.):disposal quantity 175,633,700 kg with certified disposal quantity 167,285,018 kg 2. Subsidy checking Totaled 29,870,627 NT dollars subsidy on waste motor vehicles of the recycling enterprises of southern Taiwan and comminuting classifying disposal enterprises nationwide is deducted for disqualified events.
Keyword
Inspection and certification include certified recycled-disposal quantity,Operation process auditing,Environmental safety and health auditing
Open
top